Hittade denna info på nätet:
Measuring the critical dimensions
The tiller pilot is mounted between the tiller and a fixed point on the structure of
your boat.Two dimensions are critical to ensure correct installation:
• Dimension A = 589 mm (23.2 in): the distance from the mounting socket
to the tiller pin
Note: This dimension increases if your installation requires a pushrod extension (see page
34) or cantilever mount (see page 37).
• Dimension B = 460 mm (18 in): the distance from the rudder stock’s center
line to the tiller pin
D3548-2
32 ST1000 Plus & ST2000 Plus Tiller Pilots
To measure the critical dimensions:
1. Clamp the tiller on the boat’s center line.
2. Mark dimensions A and B and use masking tape to locate the fixing points.
Note: For standard installations, dimension A is measured on the starboard side of the
cockpit. If you need to mount the tiller pilot on the port side of the cockpit, you can measure
dimension A to port. However you will need to reverse the tiller pilot’s operating sense
when you have completed installation (see page 49).
3. Make sure that:
• dimensions A and B are at right angles to each other (as shown on the
diagram opposite)
• the tiller pilot is mounted horizontally
Bilder finns här:
http://www.raymarine.com/ProductDetail. ... RODUCT=194Var är vridcentrum på en 27a?
Mvh Jonas